ueberschrift-oeffentliche |
Such buildings are subject to special requirements and laws. On the one hand, good speech intelligibility is to be secured in rooms and meeting rooms, similar to lecture halls. However, it is not only the President or the respective talker at the podium who speak, but also the delegates will often want to and must participate. This requires complex circuit techniques with location reference to locate the talker within the delegates. In addition, governmental systems often require tools for the identification of a deputy or for attendance control. Fingerprint systems are used here occasionally. The visual aids are similar to those in modern lecture theaters or convention centers.
Language selector |
amc-suche |
oeffentliche-links |
Different planning tasks in the plenary hall, the parliamentary groups and other premises since 2001. The focus was on work on room acoustics and on audio and video systems
Planning and rebuilding a conference system with digital networking.
Creation of a hall sound system with localization to the respective speaker at the desk, to the president and to the speaker in the plenum.
New construction of the Vietnamese Parliament. Room acoustic planning work in the circular plenary hall, in parliamentary and meeting rooms and in the foyer. Planning of the entire sound and media systems in all important rooms, in the plenary hall with locational reference to the speaker
Für den Bürgersaal im Rathaus Spandau in Berlin war eine neue Beschallungsanlage zu planen.
Bei der Neuplanung war der Denkmalschutz des Gebäudes zu beachten.
oeffentliche-rechts |
Room acoustic and media systems work since general renovation in 1996. After almost 20 years of new planning of the sound system with successful locational reference to the respective speaker. Use of modern speaker microphones
Renovation / reconstruction
Reconstruction of the historic building as house of Federal Council. Advice on the room acoustics of the plenary hall in 1997. Planning of the sound and conference systems. 2017-2018 Replacement of the old sound system by using digitally controlled line arrays
Renovation / reconstruction
German Embassy Washington
Media systems planning and execution supervision. Installation of the technical elements in close coordination with the responsible architectural office Involvement of a local technical office for the continuous supervision of the works during the installation