logo-schrift-start
blockHeaderEditIcon

ADA Acoustics & Media Consultants GmbH

startseitentext
blockHeaderEditIcon

Room and Building Acoustics, Noise Control,
Sound System, Audio and Video design, Sound reinforcement
Measurement, Consulting and Reports

ADA Acoustics & Media Consultants GmbH

After the defeat of the German division, and upon meeting the objective requirements, the engineering firm ADA Acoustic Design Ahnert was initially founded with two colleagues. From day one, the software program EASE, which was at that time still DOS-based, was available. As a result, the feasibility of room- and electro-acoustic designs could be efficiently verified. Large projects during the early 90s, such as the planning of a new sound reinforcement system for the German Opera (Deutsche Oper) in Berlin, supported the start-up phase.


A similar experience was gathered during the reconstruction of the Plenary Assembly of the Parliament in Ankara, where in 1996, for the first time, a fingerprint system for the identification of the Members of Parliament was introduced, which is still in operation in its original form till today. The number of awarded contracts in the country and abroad was then increasing as well as the number of employees. In 2010, the activities profile of the sole-property company ADA Acoustic Design Ahnert was transferred to ADA Acoustics & Media Consultants GmbH. Major tasks are still ahead of our team, such as the extensive Al Maktoum International Airport, which is currently under construction and is intended in its first construction phase to serve around 120 million passengers per year.

ADA - a subsidiary of WSDG
 

Walters-Storyk Design Group | WSDG

Walters-Storyk Design Group | WSDG, a globally active engineering company, is your contact for all aspects of acoustics and system integration in construction projects, especially consulting, planning and engineering for architectural integration, room, building and electroacoustics, communication, audio-video systems, Information systems, music production and entertainment venues. Our clients' projects include cultural, conference and congressional venues, multimedia rooms, music and media production and broadcasting facilities, transportation hubs, sports venues, gastronomy, educational institutions, churches and many other types of projects. In addition to pure technical planning, WSDG also takes part in strategic processes, compiles submission documents, supervise installations, carries out acoustic measurements, evaluations and programming, and supports projects from the planning, construction and acceptance phases to the training of end-users. more ...

Landtag North Rhine-Westphalia, Germany

Dusseldorf (North Rhine-Westphalia) 2001 - 2018

Renewal of media systems
Fractional Hall 2017 - 2018 Audio and video systems


Client:
The President of the Landtag of North Rhine-Westphalia Department II.5 Building Management, Dusseldorf

Architect:
Eller + Eller Architects, Dusseldorf

ADA scope of services:
Electroacoustics, video systems: design up to execution supervision

Project data:

  • Start of planning: 2017
  • Construction from July 2017
  • Completion: February 2018
  • Scope of the performed services: approx. 400.000, - EUR

Since 2001, we have the task in the North Rhine-Westphalia Parliament in the fields of room acoustics, as well as the media systems to support the Landtag administration with the gradual renovation of the various premises of the building in 1988 on the banks of the Rhine. Between 2008 and 2013, we were involved in the modernization and barrier-free renovation of the plenary hall and accompanied the migration of conference system and the replacement of sound reinforcement system. Camera system with remote-controlled head-moving systems for the public presentation of sessions in the plenary hall and other meeting rooms, as well as a motorized extendable screen were added by us in 2013/14. We are currently supporting the renewal of the “Erfrischungsraum” in building E in terms of room acoustics and media systems , and are supporting the ongoing maintenance measures after the state election in 2017 at the building's paging system. The large fractional hall of the CDU parliamentary group receives a new floor covering and new furnishing in a multi-stage conversion measure. As with the measure in the parliamentary group of the SPD in 2016, the media systems will be extensively renewed. Five motor-driven 75 "displays with 4k resolution in the center of the room allow the image reproduction for all seats in this cylindrical room with up to 160 seats. There are four places to connect a presentation device; Apple AirPlay is also supported. Together with two cameras in the hall, all the signals are processed and provided for the displays, as well as when released for transmission in the intra- and internet. The conference system communicates wirelessly with the central unit, which allows a high flexibility of the table arrangement. Together with the loudspeaker system in the ceiling area of ​​the hall and a powerful digital audio signal processing in the hall directional listening is possible in sections.

Language selector
blockHeaderEditIcon
amc-suche
blockHeaderEditIcon

referenz-landtag-duesseldorf
blockHeaderEditIcon

Landtag North Rhine-Westphalia

Gallery

Username:
User Login
Your Email
*